Takeoff for underground utilities & erosion control
The takeoff draws itself. You check the work.
Pipe runs, structures and erosion control come back found,
classified and measured — in real feet, with the evidence for every line.
~90 minof review to a finished takeoff
8 / 8sheets scaled automatically
0quantities without a verified scale